Performed full building energy modeling services including detailed life-cycle cost analysis studies for each site. Developed detailed Measurement & Verification plans following Option D in the International Performance Measurement & Verification Protocol (IPMVP) Volume III standard. Engaged the design team in the integrated design approach with regards to energy utilizing systems
Total energy recovery
Ground-source heat pumps
High efficiency lighting (interior & site)
Improved envelope
High Performance Glazing
Earned 42.3% in regulated energy cost savings equating to all 10 LEED®-NC ver 2.2 EA Credit 1 points
Earned 29.5% in regulated energy cost savings equating to 6 LEED®-NC ver 2.2 EA Credit 1 points
Winchester
Earned 35.1% in regulated energy cost savings equating to 8 LEED®-NC ver 2.2 EA Credit 1 points